Project recovery

Job in trouble? We start with a 72‑hour diagnostic.

When a fire alarm or security job is late, thin on margin, or heading for a failed acceptance, MXLV reads the job, writes down the risk, and lays out the path back to closeout. No retainer is required to start the diagnostic.

The warning signs we get called for

  • The pretest failed, or keeps slipping.
  • The AHJ rejected the submittal.
  • The PM left mid-job and nobody owns the schedule.
  • Change orders are eating the margin.
  • The occupancy date is fixed and the turnover package is not.
  • The owner or GC has stopped believing the schedule.

What happens in the 72 hours

  1. Day 1

    Documents in

    Contract documents, estimate assumptions, the current schedule, open RFIs, and subcontractor status — gathered and read.

  2. Day 2

    Field and AHJ reality

    Where install, programming, and testing actually stand, and what the authority having jurisdiction still needs to see.

  3. Day 3

    Written risk view

    What stops, what continues, and what has to be re-baselined before the next AHJ date. In writing, not a slide deck.

Then, the way back to closeout

72‑hour diagnostic

Contract documents, estimate assumptions, schedule, open RFIs, and subcontractor status. A written risk view.

Recovery plan

What stops, what continues, and what has to be re-baselined before the next AHJ date.

Subcontractor path

A replacement path when the current bench cannot finish the scope.

Testing, AHJ, closeout

Re-baselined pretests, witness tests, and the turnover package acceptance actually requires.

Priced for urgency

$225–$325+/hr

Indicative range for project recovery leadership — a published range, not a quote. This is for construction jobs in trouble, not disaster-recovery programs. The diagnostic itself does not require a retainer. Time-and-materials with a cap is available for recovery work.

The one-side rule

MXLV works one side of a project. We never represent the integrator and the owner on the same job, and the conflict check runs before a proposal exists. That is why integrators can white-label us and owners can trust the review.

If the award landed and the bench is already full, that is the engagement.

Four minutes to brief MXLV. Conflict check before a proposal. A named lead if the fit is real.